Pace and Cap  - Sartin Methodology & The Match Up

Pace and Cap - Sartin Methodology & The Match Up (http://paceandcap.com/forums/index.php)
-   RDSS 1: Bug Reports (http://paceandcap.com/forums/forumdisplay.php?f=41)
-   -   problem converting (http://paceandcap.com/forums/showthread.php?t=6542)

Chazz 01-16-2010 10:32 AM

problem converting
 
Hi Ted:

While converting PP to database on Phila Pk 01/17/2010

I received the following message.
Workouts failed to update properly for horse PROFIT.

Chazz

Ted Craven 01-16-2010 01:28 PM

1 Attachment(s)
Thanks Chazz - everyone will likely get this. As the message says, just click OK to continue (after reporting it). This is a trap for suspicious (likely incorrect) workout data supplied by Equibase to TrackMaster, which seems to happen occasionally.

The problem is that 2 workouts are reported for the same day Jan 13, 2010, one at FAI (?) and one at PHA, both 3f, both 38.2 time, per the following TrackMaster PDF screenshot of the horse:

Attachment 18960

RDSS takes the first work on the day, and skips the 2nd one (but still reports an error and stops procession :( - I changed this for RDSS 2.0)

Unknown whether the work occurred at FAI or at PHA. Nothing else is affected. I reported this to TrackMaster.

Good luck with that card, Chazz!

Ted


All times are GMT -4. The time now is 08:43 PM.

Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2026, vBulletin Solutions Inc.