Quote:
Originally Posted by stugots119
Thank you. One more question, how many days back do some of you go to accept a line.
Example if a race is being run today at 6 F and the horse ran its last race 20 days ago at 8.5 F and finished 4th, but its second line was 180 days ago at 6 F and finished 4th. Do you use the last line because it was the most recent or do you use the second line that was at the same distance as todays race?
|
It depends. In your example, Line 1 (the route race) is a non-comparable line. Ideally, you want to go back and find/use a comparable line. I would look at this horse's entire history and see how it does sprinting as well as analyze its previous E/L spreads and Total Energy. Look at the ASR and TV as well for clues. Some horses just don't scream "sprint" based on the E/L sticks and TE, and some horses may just be too slow a final time to factor. If you determine that this horse is capable of sprinting, I would either 1) go back to said comparable line or 2) project the route race to a sprint and see if the adjusted times make sense. You don't want to do anything that discredits a horse's performance if you feel that it could be a contender. Just my two cents. Others here are probably more qualified to answer that question than I!