View Single Post
Old 08-07-2008, 09:55 PM   #9
delmarscott2004
delmarscott2004
 
Join Date: Jun 2005
Location: Orange County California
Posts: 132
Pace lines

Good evening Turbulator

Selecting lines to work with within the Sartin Methodology . I use the adjusted lines screen for my FINAL line selection. High speed rated lines within the NORM , which I call within 2 speed rating points of the higest speed rating showing in the past performance .If the last line is still over two points of the norm , I enter it along with the norm line too see how both end up on the BL/Bl screen .Selected lines , same surface and within two furlongs of todays race , no off track lines if todays track condition is fast.

I hope this make since .

Vanoy
delmarscott2004 is offline