Go Back   Pace and Cap - Sartin Methodology & The Match Up > RDSS
Get RDSS
Google Site Search Get RDSS Sartin Library RDSS FAQs Conduct Register Site FAQ Members List Today's Posts

RDSS Racing Decision Support System – The Modern Sartin Methodology

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 06-02-2007, 11:05 AM   #1
mufasa
Grade 1
 
mufasa's Avatar
 
Join Date: Mar 2007
Posts: 310
Using Projected Pace in RDSS

Rich:

I am asking this question of you in particular because from what I have seen on this site you base your handicapping on “The Matchup” concepts. But more specifically, as to the RDSS program, you have from what I have seen of your screen examples utilized the projected pace call times in the program. By the way I have just been given the opportunity by Ted to be one of the testers of the RDSS program. Since I just downloaded the program this morning I have some time to go to get aquatinted with the program windows and best maneuvering practices. Not to mention I have to read all of the material that Ted sent me along with the download.

There is one thing that I would appreciate your input on and that is how do I incorporate my expectations of the projected pace call times for a particular race. I am of course trying to use JB’s ideas in the area of projecting pace call times for a race.
 First how do I get the call times into the projected pace areas without getting and error message. I have up to now been double clicking on the particular lets say first call time of horse #1 in the pp section to get it into the box (then I get an error message but the time gets into the box) and then utilizing the drop down menu window to pick the exact first call time that I want to project.
 Ditto for 2nd call and projected final time.
Second once I have by way of error messages or not entered a projected pace call time for all pertinent call times how does that affect the analysis and computations of BLBL, Energy, TPR + E/L, Primary, Segments, etc. Is there a noticeable affect? I would have to assume that there must be. I am asking because I tried it with the first race for today at Belmont and could not pick up any difference in the BLBL output vs. what I had originally gotten during my Spec160 run of the race (at least as to the T5 horses). Admittedly perhaps I was not measuring closely because I am preparing to go to the track today and probably rushing through the review. If you could for now help me with getting the information into the projected pace area without error message that would be great. And if you do not mind, could you give me some input as to the availability with the RDSS program in this area and what I am trying to do with my own projected pace numbers. Generally I am thinking that I could run the program without any projected pace input and then run again with the projected pace numbers to see if there is a meaningful difference.

[Sorry for the winded message] Thanks,
M
mufasa is offline  
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
How to best select Projected Pace in RDSS? racer100 RDSS 18 03-06-2007 09:41 AM
Matchup2 and RDSS racer100 RDSS 16 03-05-2007 01:27 PM
RDSS, More races. Lefty RDSS 2 02-18-2007 12:08 AM
Intuition and the 1st Call Projected Pace RichieP Hat Check - How Can We Help You? 12 10-10-2006 02:12 PM


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2026, vBulletin Solutions Inc.

All times are GMT -4. The time now is 07:05 PM.