Go Back   Pace and Cap - Sartin Methodology & The Match Up > RDSS > NewPace Discussion Forum (old)
Get RDSS
Google Site Search Get RDSS Sartin Library RDSS FAQs Conduct Register Site FAQ Members List Today's Posts

NewPace Discussion Forum (old) An old discussion forum for users of Dave Schwartz' NewPace (as implemented in RDSS 2.0) circa 2011

Reply
 
Thread Tools Display Modes
Old 05-19-2011, 09:15 PM   #1
Eddybugsy
AlwNW3X
 
Join Date: Jan 2009
Posts: 38
which SR?

A question for Ted.
I have forgot exactly what is adj SR. I believe you have been using net SR for EL speed (net makes sense). On my spread sheet I have been using adj SR and hence the question.
Thanks,
Bill
Eddybugsy is offline   Reply With Quote
Old 05-19-2011, 09:56 PM   #2
Ted Craven
Grade 1
 
Ted Craven's Avatar
 
Join Date: Jun 2005
Location: Nanaimo, British Columbia, Canada
Posts: 9,264
Bill,

The EL 2.0 (NewPace) screens you have seen so far use the TrackMaster Speed Rating shown on the Original screen. You can double check this by taking any EL 2.0 screenshot, taking the low SR and Hi SR shown, and then looking on the Horse's Original screen at the appropriate low ranked and high ranked TrackMaster SR and you will find they are the same number. (For example, for a horse with 10 PP lines, the 3rd highest and 4th lowest TrackMaster SR).

Now, in the next RDSS 2.0 testing release (or maybe the one after ...) we are going to move forward with also using the Adjusted SR as you have done, also the Total Energy and Perceptor Total figures to see if any is better than the initial TrackMaster SR. In fact, I would expect ALL of the foregoing would be AT LEAST as good if not better than the TrackMaster SR.

Just a reminder - Adjusted SR is an internally calulated Speed Rating derived from Final Time (and not incremental times or velocities as is Total Energy), adjusted by TrackMaster's Daily Track Variant, Inter-track Variant, and equalized and normalized to today's distance and surface. And just FYI, as a rating based on Final Time, it should co-relate almost perfectly with True Speed velocity (TS on the Velocity screen) - average velocity from the break to the finish line.

I agree that doing the calculations can be very tedious, and time is our chief asset. All I can say is that I am getting the various components of RDSS 2.0 fleshed out and debugged as fast as I can. The Beta program should be starting in June, I think you have asked to help test, and then the EL 2.0 screen will be available to you even if other parts of the software are as yet imperfect.

And yes, it does seem to run a lot faster and smoother than RDSS1 (when it's not crashing the #@$&#! toteboard, like today ). Thanks for bearing with me - I believe you will like what you see!

yours,

Ted
__________________

R
DSS -
Racing Decision Support System™
Ted Craven is offline   Reply With Quote
Old 05-19-2011, 10:12 PM   #3
Eddybugsy
AlwNW3X
 
Join Date: Jan 2009
Posts: 38
Thanks Ted.
June is right around the corner and then before we know it SARATOGA!
Eddybugsy is offline   Reply With Quote
Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2026, vBulletin Solutions Inc.

All times are GMT -4. The time now is 05:04 AM.